New construction of the GDRMA Dradenau
Between August 2022 and August 2023, FRIEDRICH VORWERK SE & Co. KG carried out the construction of the new Dradenau gas pressure regulation and metering plant (GDRMA) on behalf of Gasnetz Hamburg GmbH. The scope of work comprised the complete plant construction, including structural engineering and pipework. The plant is equipped with state-of-the-art control, metering and safety technology and has already been prepared for the future blending of at least 30 per cent hydrogen. Some components are even designed for operation with up to 100 per cent hydrogen.
Customer
Gasnetz Hamburg GmbH
Order Type
General contractor
Construction time
08/2022 -
08/2023
Replacement construction of the FWS 15, Äußere Lettiner Straße
Construction of the new district heating secondary pipeline 15 in construction phase 1 on Äußere Lettiner Straße, with a total route length of approximately 1,030 m (DN 250/400 and DN 200/315, PN 16). The project was undertaken to replace an existing above-ground pipeline and to connect the Heide-Nord sewage treatment works for the utilisation of process heat. A construction halt in the spring due to nature conservation requirements was taken into account, but the construction project was completed on schedule.
Customer
Energieversorgung Halle Netz GmbH, Bornknechtstraße 5, 06108 Halle (Saale)
Order Type
General contractor
Construction time
01/2024 -
12/2024
Replacement construction of the FWS 15, WÜST Heide-Nord and Fischerring
Replacement of the FWS 15 district heating secondary pipeline between WÜST Heide-Nord and Fischerring over a pipeline length of approximately 350 m (DN 250/400, DN 200/315, DN 125/225, DP 16). The works included the resizing of the supply pipes, the removal of old above-ground pipes and the concurrent installation of cable protection conduits for information technology systems.
Customer
Energieversorgung Halle Netz GmbH, Bornknechtstraße 5, 06108 Halle (Saale)
Order Type
General contractor
Construction time
08/2023 -
11/2023
District heating network expansion in the Paulusviertel
Between October 2022 and July 2023, FRIEDRICH VORWERK SE & Co. KG carried out a district heating network extension in the Paulusviertel district of Halle (Saale) to connect an existing isolated network to the inner-city district heating network. The project involved a route approximately 300 metres long running along Willy-Lohmann-Straße, via Rathenauplatz to Maxim-Gorki-Straße, along which composite pipes with a plastic outer casing up to DN 200/315 were laid.
Customer
EVH GmbH, Bornknechtstraße 5, 06108 Halle (Saale)
Order Type
General contractor
Construction time
08/2023 -
07/2023
Replacement of District Heating Line 60
The project ‘Replacement of District Heating Pipeline 60, Passendorfer Wiesen’ involved the construction of a new District Heating Pipeline 60 (supply line DN600/900 and return line DN600/800). As part of this construction work, a new bridge was built to cross the Ruder Canal, and the district heating pipeline was connected to the existing pipework.
Customer
Energieversorgung Halle Netz GmbH
Order Type
Joint venture
Construction time
01/2024 -
02/2026
COOL Gellersen
FRIEDRICH VORWERK completed the turnkey construction of a CO₂ liquefaction plant for processing carbon dioxide from a biogas treatment plant in Kirchgellersen. The plant produces up to 600 kg/h of high-quality, cryogenic liquid CO₂ and meets strict requirements for use in the food industry, including for mineral water.
Customer
Bioenergie Gellersen GmbH & Co. KG
Order Type
General contractor
Construction time
02/2023 -
06/2024
Kumasi 1 Thermal Power Project
The fuel gas supply plant for the Kumasi 1 Thermal Power Project (K1TPP) draws natural gas from the local grid, processes it, and reliably supplies a 250-MW gas-fired power plant with conditioned fuel gas, thereby strengthening the power supply and grid stability in the Ashanti Region. The scope of work included engineering, fabrication, transportation, and installation of the plant, which features redundant supply lines as well as systems for gas purification, measurement, preheating, and pressure regulation.
Customer
Volta River Authority-Corporate
Order Type
General contractor
Construction time
02/2023 -
12/2026
Gas treatment plant Halle-North sewage treatment plant
Gas treatment plant Halle-North sewage treatment plant
Customer
Hallesche Wasser und Stadtwirtschaft GmbH, Bornknechtstraße 5, 06108 Halle (Saale)
Order Type
General Contractor
Construction time
08/2019 -
02/2020
New construction of the Würselen compressor station
New construction of the Würselen compressor station
Customer
Open Grid Europe GmbH, Kallenberger Straße 5, 45141 Essen
Order Type
Consortium
Construction time
07/2019 -
11/2020
BGAA Bachenbülach
Biogas upgrading plant using the membrane process for 220m³/h raw biogas, with expansion preparation to 400m³/h
Customer
Energie 360 ° AG, Aargauerstraße 182, CH-8010 Zürich
Order Type
General Contractor
Construction time
03/2019 -
07/2019